GUIDE SPECIFICATIONS  |  Section 3.6
                                                                       POLY-I-GARD  575FC (FAST CURE)
                                                                                        ™





        elastomeric system with properties allowing it to expand and   PHASE 3:
        contract with normal structural movements. It can be applied   Apply PC-260 to substrate at a rate of 1.5 gallons/100 sqft (0.61
        to protect surfaces against spalling, freeze/thaw damage, and   liters/sqm) or 66 sqft/gallon. For best results, use a 1/8” (0.32
        chemicals commonly encountered on pedestrian decks. It will   cm) notched trowel or notched squeegee. A 3/8” (0.965 cm)
        neither soften in heat nor embrittle in the cold. Recommended   nap phenolic core roller may be used, but extra care should
        system coverage mil thickness: light vehicular traffic systems,   be taken to prevent air bubbles. Spread mixed PC-260 evenly
        42 ± 5  dry mils (1067 ± 125 dry micron)  and heavy vehicular   over the entire deck resulting in a minimum 24 ± 2 dry mils
        traffic systems 54 ± 5 dry mils (1372 ± 125 dry microns). Make   (608 ± 50 microns) thick membrane. Allow PC-260 to cure
        sure to use the correct grade of product which complies with   before proceeding to Phase 4.
        VOC regulations/requirements applicable as per federal, state,
        statutory, counties, cities and local bodies at the place of   PHASE 4:
                                                                             ™
        installation.                                         Apply Poly-I-Gard  295 at a rate of 1.2 gallon/100 sqft (0.49
                                                              liters/sqm) or 78 sqft/gallon. Immediately broadcast washed,
        Product Instructions                                  dry, rounded sand, 2-16 mesh (0.841-1.19 mm), 6.5+ Mohs
        For complete information associated with the application of   minimum hardness at a rate of 10-15 lbs/100 sqft (0.5-0.75
        all Polycoat Products decking systems and products, refer   kg/sqm) or as required to achieve a slip-resistant finish and
        to the General Guidelines and Technical Data Sheets of the   immediately backroll the sand into the wet coating so that the
        Polycoat Products catalog, which describes the products,   sand is fully encapsulated. This coat will result in an additional
        surface preparation, job conditions, finishing details and other   minimum 18 ± 2 dry mils (305 microns) thick membrane,
        necessary information.                                exclusive of aggregate. Optional: Poly-I-Gard  295 TEXTURED
                                                                                                   ™
        Coatings Application                                  is available for this application. Please call your local REP for
                                                              details.
        PHASE 1:
        Check area of application to ensure that it conforms to the   PHASE 5:
        substrate requirements as stated in the General  Guidelines.   For ramps, turn radii, and other heavy traffic areas, apply
        Prime all joints, cracks, flashings with approved primers as   Poly-I-Gard  295 over the entire surface, including heavy
                                                                       ™
        specified below in Phase 2. Apply PC-260 over all joints, cracks,   traffic areas, at a rate of 1 gallon/100 sqft (0.41 liters/sqm) or
        and flashing. Bridge joints, cracks, and flashings with 4” (10.2   100 sqft/gallon. Immediately broadcast and broadcast washed,
        cm) Straight Jacket Tape, pushing it into the PC-260 with a   dry, rounded sand, 20 mesh (1.19 mm), 6.5+ Mohs minimum
        trowel. Using PC-260 as a caulking compound will shorten   hardness at a rate of 10-20 lbs/100 sqft 0.5-0.75 kg/sqm) or as
        the curing time appreciably over conventional polyurethane   required to achieve a slip-resistant finish and immediately
        caulks. Over reinforcement tape, apply a stripe coat of PC-260   backroll sand into the wet coating so that the sand is fully
        and taper it onto the adjacent surface. All cracks in concrete   encapsulated. This coat will result in an additional 15 ± 2
        substrates must be treated per Polycoat Architectural Details.   dry mils (381 ± 50 microns) thick membrane, exclusive of
        Allow the surface to cure for 4 to 6 hours.           aggregate. Optional: Poly-I-Gard  295 TEXTURED is available
                                                                                         ™
                                                              for this application. Please call your local REP for details.
        PHASE 2:
        Concrete should be primed with Polyprime  21 or Polyprime    FINISHED SYSTEM:
                                            ®
                                                          ®
        2180SC at a rate of 1 gallon/300 sqft or 300 sqft/gallon. Apply   When applied as directed, the Poly-I-Gard  575FC (Fast Cure)
                                                                                                 ™
        using a brush or phenolic core roller. This will result in a 4   Vehicular Traffic Deck System will provide 43 dry mils (1067 ±
        dry mils (102 micron) thick membrane. Metal should only be   125 dry micron) and 54 dry mils (1372 ± 125 dry microns) on
        primed with Polyprime  2180SC at a rate of 1 gallon/300 sqft   ramps, turn radii, and other heavy traffic areas, exclusive of
                            ®
        or 300 sqft/gallon. Allow Polyprime to become tack free before   aggregate, of superior waterproofing protection.
                                     ®
        proceeding to Phase 3.
                                                              Requires a continuous coating application to minimize lines
        Note: For rough or porous concrete or when outgassing is a concern,   and/or streaking. Any optional adhesion test is to be performed
        use Polyprime  EBF-LV at an approximate rate of 1 gallon/200 sqft
                   ®
        (0.20 liters/sqm) or 200 sqft/gallon; this rate may vary on the porosity   seven days after product application.
        of the substrate. Allow primer to become tack free before moving to
        the Coating Application. The point at which the primer is deemed tack   STRIPING:
        free is when the primer passes thumbprint test. The thumbprint test is   It is recommended that an Epoxy paint is used for line striping.
        defined by when a thumbprint is left in the primer and primer does not
        transfer to the thumb. If the primer has been allowed to remain tack  Limitations
        free for more than 12 hours, it is necessary to solvent wipe surface   The following conditions must not be coated with Polycoat
        with VOC-compliant solvent and re-prime the surface.


        POLYCOAT PRODUCTS TEL 562.802.8834  |  FAX 562.921.7363                                           Section 3.6
        wpsales@polycoatusa.com  |  www.polycoatusa.com
   73   74   75   76   77   78   79   80   81   82   83